Beckholmen Shipyard

Image
Image

Design gestures

The building plan follows a simple arrangement of a main hall in the center with additional workshops on each sides. The workshops serves both the main hall of the shipyard building, as well as the large commercial dry dock on the east side of the building and ship parking on the west side.

Image
Image
Image

External influences

The geographical position and location in the city puts high demands on the design of the new shipyard building. The maritime character is to be safegaurded and the National City Park wishes to preserve the cultural history and vegetation at all costs.